Exterior and interior work
![](http://photos1.blogger.com/blogger/6237/1447/320/foundation1.jpg)
Work continues on the foundation for the new addition.
![](http://photos1.blogger.com/blogger/6237/1447/320/Excavation%20of%20east%20wall%201910%20bldg%20-%2010-28-05.jpg)
At the same time, the east side of the 1910 building is being excavated to improve drainage.
![](http://photos1.blogger.com/blogger/6237/1447/320/1910_building_restoration1.0.jpg)
Restoration of the interior of the 1910 building has begun. This is a view of the area near the double doors that led from the Children's Room to the glass floor mezzanine.
![](http://photos1.blogger.com/blogger/6237/1447/320/1910_building_restoration2.jpg)
All of the fluorescent lights will be removed and replaced with historically appropriate fixtures.